• RM of Sherwood(Regina), Saskatchewan
  • GM Ryan Clark: 306.924.1065
  • info@wiri.ca

Services

Complete Bridge Replacement

Western Infrastructure Renewal Inc. has been involved in the construction of several new bridge buil...

In-Situ Pile Cap Replacement

Western Infrastructure Renewal Inc. has developed techniques to replace these elements in place with...

Concrete Stringer Repair

Western Infrastructure Renewal Inc. can repair minor to major damages to concrete and reinforced ste...

Precast Concrete Stringer Replacement

Precast concrete stringers with cracks and spalls if left unrepaired can become structurally deficie...

Slope Stabilization - Geosynthetically Reinforced Soil (GRS)

These GRS walls are designed to lessen/remove the lateral pressure on the existing bridge abutment w...

Slope Stabilization - Low Density Fill

Reduces lateral forces to help eliminate movement at the bridge/approach interface....

Erosion Repair, Stabilization, and Armouring

Fill erosion repaired and stabilized...

Abutment Repair and Armouring

Installation of Geosynthetic Reinforced Soil integrated bridge system and embankment armouring....

Bridge Widening

Western Infrastructure Renewal Inc. extended the width of this bridge by adding additional abutment ...

Railing Replacement

The original W-Beam bridge rail on the East side of the bridge was damaged during a vehicle accident...

In-Situ Pile Repair

These systems are based on removing the rot, filling the void with clean gravel, encasing the entire...

Concrete Pile Cap Replacement

The existing abutment cap and piling was degraded beyond repair and was replaced with a new concrete...