Highway 21
9.6km South of Maple Creek & 46km South of Maple Creek
This was 2 full bridge replacement projects conducted concurrently for the Ministry Of Highways. These bridges were timber bridges replaced with a steel driven pile/precast concrete pile cap sub structure with a precast concrete girder super structure.
Details
Client: