• RM of Sherwood(Regina), Saskatchewan
  • GM Ryan Clark: 306.924.1065
  • info@wiri.ca

Portfolio

image

Construction of the bridge over Moosomin Lake

Replacement of nine span timber bridge with a three span concrete and steel bridge.
image

Construction of bridge over Long Creek

Replacement of a four span timber bridge with a three span concrete and steel bridge.
image

Maintenance Projects

We do various maintenance jobs in all the following places: RM of Gary, RM of Abernathy, RM of Baildon, RM of Preeceville, RM of Cote, RM of North Qu'Apelle, and RM of Maple Creek
image

Highway 6

4.7km North of Melfort This was a full bridge replacement project for the Ministry Of Highways. It was a timber bridge replaced with a steel driven pile/precast concrete pile cap sub structure with a precast concrete girder super structure.
image

Highway 21

9.6km South of Maple Creek & 46km South of Maple Creek This was 2 full bridge replacement projects conducted concurrently for the Ministry Of Highways. These bridges were timber bridges replaced with a steel driven pile/precast concrete pile cap sub structure with a precast concrete girder super structure.
image

Pickford Road Bridge

RM of Maple Creek This was a full bridge replacement project for the RM of Maple Creek. It was a timber bridge replaced with a GRS (Geosynthetic-Reinforced Soil) sub structure with a precast concrete girder super structure.