Portfolio

image

In-Situ Pile Repair

The resulting repair has been tested by several transportation agencies in the United States and have found to be approximately 4 x the strength of the original pile.
image

Concrete Pile Cap Replacement

The existing abutment cap and piling was degraded beyond repair and was replaced with a new concrete and steel structure. The steel superstructure was lifted only a few feet above the original structure.
image

Erosion Repair, Stabilization, and Armouring

Fill erosion repaired and stabilized
image

Construction of the bridge over Moosomin Lake

Replacement of nine span timber bridge with a three span concrete and steel bridge.
image

Construction of bridge over Long Creek

Replacement of a four span timber bridge with a three span concrete and steel bridge.
image

Abutment Repair and Armouring

Installation of Geosynthetic Reinforced Soil integrated bridge system and embankment armouring.
image

Railing Replacement

The original W-Beam bridge rail on the East side of the bridge was damaged during a vehicle accident. Western Infrastructure replaced the existing railing with a more substantial Thrie Beam system.
image

Bridge Widening

Western Infrastructure Renewal Inc. extended the width of this bridge by adding additional abutment and wing wall piling, backing planks and two new girders.